Skip to content
814.443.2780 CONTACT US

This project was completed in 2008 by S&S Excavating. The project installed approximately 1500 LF of large diameter Storm Sewer pipe and related catch basins and an end wall that discharged into the tributary that is the head water of the Stoney Creek River.    The major source of this water is the Pious Spring which originates on Main Street in the middle of Berlin.

A branch line and inlets were installed to drain the Stewart Street area.

Back To Top